Home arrow Clients arrow All Other Reference arrow Geotechnical Invest

Menu

Geotehnical Investigations, Testing and Monitoring facilities PDF Print E-mail

1. PREPARATION OF TECHNICAL DOCUMENTATION FOR GEOTECHNICAL INVESTIGATIONS AND TESTING OF FACILITY FOUNDATION DEFINITION (in order of construction from 1950 to 1996)
Mavrovo Hydroelectric Power Plant (HPP), Vrla HPP, Zvornik HPP, Vinodol HPP, Jajce I HPP, Peruæa HPP, Tikveš HPP, Rama HPP, Špiljski Most HPP, Split HPP, Globoèica HPP, Raven HPP, Gojak HPP, Globoèica HPP, Bistrica HPP, Vrapèište HPP, Vrutok HPP, Žur HPP; the dams of Gradèe, Sužanj, Rastovaèa; Komarnica HPP, Modrac Dam, Vuk Bijela HPP, Zaton HPP, Peruæica HPP, Glažanj Dam, Kokin Brod HPP, Kalimanci Dam, Neretvica Dam, Vodoènica Dam, Trebišnica HPP, Andrijevo HPP, Dubravica HPP, Senj HPP, Majdanpek Copper Mine, Kadina Reka Dam, Djerdap HPP, Kraljevo-Lopatnica HPP, Sklope Dam, Granèareov Dam, Bogovina Mine, Èerben HPP, Šilje HPP, Titov Veles HPP, Studenica HPP, Rijeèina HPP, Potpeæ HPP, Skopje HPP, Trnovo HPP, Mratinje HPP, Salakovac Dam, Majdanpek Dam, Selova Dam, Èoka Dulkan Open-pin Mine, Bor Open-pit Copper Mine, Ratovo Dam, Roge Dam, Èiflik Dam, Zavoj HPP, Gradec Dam, Mala Rijeka Railway Bridge, Dubravica HPP, Zlatibor Dam, Sjenica HPP, Vrutci Dam, Grabovica Dam, Obrovac HPP, Otiloviæi Dam, Kozjak Dam, Snežnica Dam, Mostar Dam, Lešæe HPP, Barje Dam, Grlište Dam, Prvonek Dam.

INTERNATIONAL
Khajuri Kach Dam in Pakistan, Wadi Gattara Dam in Lybia, Poechos Dam in Peru, Hemren Dam in Irak, Inguri Dam in Irak, Ostur Dam in Iran, Bekhme Dam in Irak, Tange Suleiman Dam in Iran.

2. DESIGN OF DAM MONITORING AND RECORDING FOR THE FOLLOWING FACILITIES
Jablanica HPP, Jajce I and II HPP, Mavrovo Dam, Lipkovo Dam, Tikveš HPP, Globoèica HPP, Pranèeviæi HPP, Mala Rijeka Railway Bridge, Glažanj Dam, Sokolovica Dam, Zlatibor Dam, Modrac Dam, Gruža Dam, Vrutci Dam, Barje Dam, Veliki Majdan Dam, Brestovac Dam and Bor Dam.

3. DESIGN AND IMPLEMENTATION OF TESTING OF DELIVERY TUNNELS, SURGE TANKS, CHAMBERS, AND MINE AND ROADWAY TUNNELS AND BRANCHES
Vrla HPP, Jablanica HPP, Mavrovo HPP, Vrla II HPP, Bajina Bašta HPP, Jajce I HPP, Rama HPP, Kokin Brod HPP, Lipkovo Dam, Vrutok HPP, Gojak HPP, Peruæica HPP, Bistrica HPP, Senj HPP, Nikola Tesla HPP, Split HPP, Globoèica HPP, Rembas Mine, Zlatibor Railway Tunnel, Veliki Krivelj Mine, Belgrade Tunnel, Dovarje Tunnel (testing and recovery works), Tušanj Salt Mine, Palisad Tunnel, Èapljina HPP, Vraèar Tunnel, Vukov Spomenik Station.

4. INJECTION DESIGN AND MONITORING OF PRESSURE TUNNELS FOR
Jablanica HPP, Vrutok HPP, Jajce I HPP, Bistrica HPP, Rama HPP, Kozjak Dam, Lipkovo Dam, Gojak Dam, Prilep Dam, Modrac Dam, Tušanj Salt Mine, Bajina Bašta reversible HPP, Pirot HPP.

Injection instructions were issued to all the facilities.

5. DESIGN OF TESTING AND RECOVERY WORKS FOR BRIDGES, OVERPASSES AND RAILWAY TUNNELS
Brankova Street overpass - Belgrade, Nišava Bridge - Niš, Sateska Bridge, Ovèar Banja Bridge, Popovac Bridge, Palilula - Podvis Bridge, Sozina Railway Tunnel, Sekuliæa Brdo Railway Tunnel, Crveni Krst Railway Tunnel - Prahovo, Djerdap Dam Bridge, bridge near Beška, Metalci Warehouse, steel platform at Kladovo.

6. DESIGN OF SEISMIC AND GEOELECTRICAL TESTING, AND IMPLEMENTATION OF GEOPHYSICAL TESTING
Dulenka Dam, Studenica HPP (Miliæi to Ivanoviæi), Potpeæ HPP, Rama HPP, Military Facility M, Bor Copper Mine - open pit, Budva Dam, River Jezava embankment, Tigar and Crnoklište HPP, Arilje Purification Plant, Tušanj Salt Mine, Prvonek Dam, Medijana Water Source, Bor Dam, Æelije Dam, Bresnica Dam, Bovan Dam.
 

Newsflash

IWA Specialist Groundwater Conference

from 8. to 10. September 2011.

Preparation and implementation of
groundwater components of water management plans
Aerobic state of groundwater
Climate changes
Management of urban groundwater basins 

Conference programme

 

Gallery